The Planet Immo company built an office building on the lakeside of Tunis, in Tunis in 2008. This office building comprises 3 floors and has in total a built-up area of 2740 m². The main measures to save energy are the thermal insulation of roof terraces and exterior walls, the use of double glazed windows and window shades, and the use of energy efficient heat pumps. The implementation of these measures has resulted in an annual energy savings of electricity of around 565 MWh.

Project info

Construction phase
New construction
Building type
Non-residential building
Detailed building type
Office
Net floor area
2740 m2
Land plot size
5043 m2
Stories
3 stories
Construction type
Mixed construction
Original construction year of the building
2008
Project contact
Planet Immo Company
Contact email address
contact@planet.net.tn

Project team

Developer(s)/owner(s)
Planet Immo Company
Architect(s)
ARCHI Architecture Company
Energy efficiency consultant(s)
Mr. Mounir Kriaa
HVAC consultant(s)
EUREKA HVAC Engineering Company
Other project team partners
Electricity: ASSISTECH, Steering and Coordination Company: SECOTEB, Technical Inspection: VERITAS

Building Rating and Certifications systems

Rating and certifications systems
Other
Other certification
The building acheived the 5th rating per the Tunisian Thermal Regulation (110 kWh/m².a)

Building Envelope

External walls

Description of construction
The external walls are constructed with the following components: an interior coating of 2.5 cm, a 15 cm concrete wall, a 5 cm layer of glass wool panels, a 5 cm air blade, and a 1.5 cm sandstone ventilated façade.
U-Value
0.57 W/(m²*K)

Roof

Roof type
Flat roof
Description of construction
2 cm interior coating, a 10 cm armoured concrete layer, a 12 cm aerated concrete slope, a 0.3 cm bitumen coat, a 0.3 cm SP2 vapour barrier, a 4 cm rock wool layer, a 0.4 cm waterproofing membrane, and a 4 cm dalette
U-Value
0.41 W/(m²*K)

Openings and windows

Glazing type
Double glazed
Overall u-value window
2.3 W/(m²*K)
Description of construction
The window bays are constructed with frames made from aluminium and low-e double glazing, with a thickness of 8/8/6 mm. The low-e coating is integrated on the interior glass.

Basement floor

U-Value
2.2 W/(m²*K)

Technical Building Systems

Ventilation system

Type of ventilation
Free ventilation (windows)

Space cooling system

Primary space cooling system
Efficiency
3.3
Description
The building's space cooling is provided by a system that relies on two high-performance air-water reversible heat pumps featuring advanced scroll compressors, which ensure optimal efficiency and reliability., and fan coil units
Manufacturer(s) / products
Carrier

Space heating system

Primary Space heating system
Heat Pump (air-water)
Description
The building's space heating is provided by the same system of air-water reversible heat pumps and fan coil units.
Manufacturer(s) / products
Carrier

Lighting system

Primary lighting system
LED (Light emitting diode lamps)
Efficiency
100

Shading devices

Type of shading system installed
Static (fix) shading systems as part of the building architecture (e.g. Maschrabiyya, porch roofs, pergolas)
Description
The bay windows are fitted with aluminium sunshade slats, which provide effective solar shading and represent a practical solution for reducing solar heat gain. The angled design, at 60° to the windows' normal angle of incidence, provides effective protection for southeast and southwest facing bay windows. This solution allows for the obstruction of direct solar radiation while maintaining the natural lighting of the interior spaces.

Final Energy Demand

Energy carrier (1)
Electricity
Total specific final energy demand
88 kWh/(m²*a)