Rabat, Morocco
Headquarters of the Higher Council for Education, Training and Scientific Research (CSEFRS)
The East-West orientation of the building project in relation to the course of the sun, makes it possible to optimise inputs and reduce heat loss. The CSEFRS has made an investment in two photovoltaic installations that, with the equivalent of 352 MWh, cover 55% of the site's electricity needs, which have been estimated at 600 MWh per year.
Project info
- Construction phase
- New construction
- Building type
- Non-residential building
- Detailed building type
- Office
- Stories
- 4 stories
- Construction type
- Mixed construction
- Original construction year of the building
- Unknown
- Project contact
- Headquarters of the Higher Council for Education, Training and Scientific Research
- Contact email address
- contact@csefrs.ma
Project team
- Developer(s)/owner(s)
- Headquarters of the Higher Council for Education, Training and Scientific Research
- Architect(s)
- El Bachir Biad
Building Rating and Certifications systems
- Rating and certifications systems
- Not applicable
Building Envelope
External walls
- U-Value
- 0.89 W/(m²*K)
Roof
- Roof type
- Flat roof
- U-Value
- 0.58 W/(m²*K)
Openings and windows
- Glazing type
- Double glazed
- Overall u-value window
- 2.87 W/(m²*K)
Basement floor
- U-Value
- 0.18 W/(m²*K)
Technical Building Systems
Ventilation system
- Type of ventilation
Space cooling system
- Primary space cooling system
Lighting system
- Primary lighting system
Shading devices
- Type of shading system installed
- Manual systems (e.g. roller shutters, folding shutters, external blinds)
Photovoltaics
- Total module area
- 1200 m²
- Description
- Administration: 600m² / Parking: 600m²/ Each PV field is divided into subfields, each fed from an inverter to which different strings are connected in parallel.
Final Energy Demand
- Total specific final energy demand
- 600 MWh/year. kWh/(m²*a)