Hurghada , Egypt
Iberotel Makadi Beach
The project is a hotel located in Makadi Bay. The project has undergone renovations to become more sustainable and reduce its energy consumption. Main focus of the renovations was on lighting of rooms and public areas and on providing hot water for the 313 guest rooms supplied via solar water heaters. Improvements also included replacing halogen and florescent lighting lamps with LED lighting lamps and spots. More shading for rooms was also added via static shading pergolas in front of each room and at each room's terrace.
Project info
- Construction phase
- Refurbishment
- Building type
- Non-residential building
- Detailed building type
- Hotel
- Net floor area
- 28.450 m2
- Land plot size
- 57.456 m2
- Stories
- 2 stories
- Construction type
- Concrete
- Original construction year of the building
- 1998
- Project contact
- Hassan El-Hawary
- Contact email address
- asstroomsdivision.makadibeach@jazhotels.com
Project team
- Developer(s)/owner(s)
- Iberotel Hotels
- Architect(s)
- Travco Constructions
- Construction contractor(s)
- Travco Constructions
- Energy efficiency consultant(s)
- Mirrage
- HVAC consultant(s)
- Miraco Carrier
Building Rating and Certifications systems
- Rating and certifications systems
- Other
- Other certification
- GREEN STAR
Building Envelope
External walls
- Description of construction
- N/A
Roof
- Roof type
- Flat roof
- Description of construction
- N/A
Openings and windows
- Glazing type
- Single glazed
- Frame material / description
- Alu-metal terrace door with heavy duty glass plus wooden window beside the bed
- Overall u-value window
- 3 W/(m²*K)
Basement floor
- Description of construction
- Insulation layers between floors
Additional thermal insulation materials
- Specification
- Bitomen
Technical Building Systems
Ventilation system
- Type of ventilation
- Free ventilation (windows)
Space cooling system
- Primary space cooling system
- Mounted single-split or window air conditioner│Usually a visible smaller system mounted outside the wall or above the window just supplying one room
- Description
- Concealed units that vary in HP between 1st and 2nd floor
Water heater system
- Primary water heater system
- Solar Thermal collector on the roof
- Description
- Solar panels to feed hot water tanks with volume that varies between 160, 200 and 300 liters. Rooms are provided with 50 liters of hot water per day.
- Manufacturer(s) / products
- Calpak
- Secondary water heater system
- Solar Thermal collector on the roof
- Description
- Solar units mentioned above contains electrical water immersed heaters to cover shortage in hot water that may occur due to cloudy weather.
- Manufacturer(s) / products
- Calpak
Lighting system
- Primary lighting system
- LED (Light emitting diode lamps)
- Efficiency
- 100
- Description
- Lighting of rooms is driven by power saver (five lamps per room, nine watt per lamp) and landscape lighting is driven by solar sensors (seven watt per amp).
- Manufacturer(s) / products
- Philips
Shading devices
- Type of shading system installed
- Manual systems (e.g. roller shutters, folding shutters, external blinds)
- Description
- Each room contains blackout shutter, wooden window, and frosted glass. More shading is provided for rooms by static shading pergolas in front of each room and on each room's terrace.
Other technical building systems
- Description
- More shading is provided for rooms by static shading pergolas in front of each room and at each room's terrace
Final Energy Demand
- Energy carrier (1)
- Electricity
- Energy carrier (2)
- Diesel
- Total specific final energy demand
- N/A kWh/(m²*a)