Giza, Egypt
InfoFort Warehouse
The InfoFort Warehouse has a total built up gross area of 16,963m2 and is located in 6th of October City industrial zone. The project is divided into two zones: the administrative building and the warehouse. The administrative building, a concrete structure with three floors, serves as the main entrance. The warehouse portion is further divided into four sections: three main zones due to a separated racking system and a fourth zone. The fourth zone contains transit area, auditing rooms, scanning rooms, security and services areas. The building is LEED certified and incorporates many energy efficient measures such as double glazing and roof insulation.
Project info
- Construction phase
- New construction
- Building type
- Non-residential building
- Detailed building type
- Warehouse
- Net floor area
- 16963 m2
- Land plot size
- 22.988 m2
- Stories
- 3 stories
- Construction type
- Steel Frame
- Original construction year of the building
- 2013
- Project contact
- Dr. Moemen Afify
- Contact email address
- Moemen@maconsultants-eg.com
Project team
- Developer(s)/owner(s)
- InfoFort Egypt
- Architect(s)
- MA Consultants
- Construction contractor(s)
- Constec
- Energy efficiency consultant(s)
- LEED Consultant EMS
- HVAC consultant(s)
- Constec
Building Rating and Certifications systems
- Rating and certifications systems
- LEED
Building Envelope
External walls
- Description of construction
- More than 25% of the project’s material are lightweight compared to similar conventional materials. More than 50% of the project’s materials are prefabricated elements (steel frames and prefabricated concrete slabs).
Roof
- Roof type
- Flat roof
- Description of construction
- Sandwich panel (Corrugated steel sheet + insulation + flat steel sheet) to enhance heat insulation, with 85 Solar Reflectance Index
Openings and windows
- Glazing type
- Double glazed
- Overall u-value window
- 2.8 W/(m²*K)
Basement floor
- Description of construction
- N/A
Technical Building Systems
Ventilation system
- Type of ventilation
- All ventilation fans are connected to BMS (energy cost savings of 29.84%). Ventilation rates for all occupied spaces meets the minimum established in ASHRAE Standard 62.1-2007.
Space cooling system
- Primary space cooling system
- High-efficiency split systems
- Description
- Using HVAC devices that do not use CFC or HCFC-based refrigerants.
Lighting system
- Primary lighting system
- LED (Light emitting diode lamps)
- Efficiency
- 100
- Secondary lighting system
- Sky lights
Final Energy Demand
- Total specific final energy demand
- N/A kWh/(m²*a)