Gebze, Turkey
The Turkey Scientific Research and Development Centre (RMI Turkey)
This project is located at the Betek manufacturing facility site in the Gebze Organized Industrial Zone, Kocaeli, near Istanbul. The building will be used year-round for technical testing of building materials and for training purposes.
Project info
- Construction phase
- New construction
- Building type
- Non-residential building
- Detailed building type
- Office
- Net floor area
- 1763 m2
- Stories
- 3 stories
- Construction type
- Mixed construction
- Original construction year of the building
- 2006
- Project contact
- RMI, Turkey Scientific Research and Development Center
- Contact email address
- info@rmi.com.tr
Building Rating and Certifications systems
- Rating and certifications systems
- Other
- Other certification
- ENERGY GLOBE Award 2008
Building Envelope
External walls
- Description of construction
- Insulation
- U-Value
- 0.49 W/(m²*K)
Roof
- Roof type
- Flat roof
- U-Value
- 0.49 W/(m²*K)
Openings and windows
- U-Value glass
- 1.7 W/(m²*K)
Additional thermal insulation materials
- Specification
- Natural day lighting via two skylights of 190m² and special day lighting systems for the lower floors with solar tubes
Technical Building Systems
Ventilation system
- Type of ventilation
- Description
- Geothermal heat system
Space cooling system
- Primary space cooling system
- Description
- Ground heat pumps for cooling and heating
Space heating system
- Primary Space heating system
- Heat Pump (ground source)
- Description
- Ground heat pumps for cooling & heating
Lighting system
- Primary lighting system
- Description
- Natural daylight by two skylights of 190 m² and special daylight systems for the lower floors with solar tubes
Shading devices
- Type of shading system installed
- Static (fix) shading systems as part of the building architecture (e.g. Maschrabiyya, porch roofs, pergolas)
- Description
- Shading
Final Energy Demand
- Energy carrier (1)
- Electricity
- Energy carrier (2)
- Oil
- Annual heating demand
- 45 kWh/(m²*a)
- Annual cooling demand
- 41 kWh/(m²*a)
- Annual lighting demand
- 7 kWh/(m²*a)
- Total specific final energy demand
- 94 kWh/(m²*a)
Financial Aspects
- Project construction cost
- 1063000 EUR