Casablanca, Morocco
Mohammed VI International University Hospital
The Mohammed VI International University Hospital is a large-scale state-of-the-art project dedicated to scientific research and education in medicine. Extending over a covered area of 47,000m², it has a total reception capacity of 325 beds, 28 consultation rooms, 15 exploration and treatment rooms and 11 operating theaters on a technical platform meeting international standards. The centers of excellence which make this hospital a benchmark are the Mother-Child Center, the Trauma-Center, the Head and Neck Center. The hospital offers its patients a care space that combines efficiency with pleasure and its staff a work environment conducive to growth and continuous improvement.
Project info
- Construction phase
- New construction
- Building type
- Non-residential building
- Detailed building type
- Hospital
- Net floor area
- 47000 m2
- Land plot size
- 45000 m2
- Stories
- 4 stories
- Construction type
- Mixed construction
- Original construction year of the building
- 2017
- Project contact
- BYMARO
- Contact email address
- last@fckm.ma
Project team
- Developer(s)/owner(s)
- FONDATION CHEIKH KHALIFA IBN ZAÏD
- Architect(s)
- FAOUZI BOUAYAD
- Construction contractor(s)
- BYMARO
Building Rating and Certifications systems
- Rating and certifications systems
- Other
- Other certification
- HQE
Building Envelope
External walls
- U-Value
- 0.42 W/(m²*K)
Roof
- Roof type
- Flat roof
- U-Value
- 0.34 W/(m²*K)
Openings and windows
- Glazing type
- Double glazed
- Overall u-value window
- 2.44 W/(m²*K)
Basement floor
- U-Value
- 0.53 W/(m²*K)
Technical Building Systems
Ventilation system
- Type of ventilation
- Natural ventilation / self-adjusting CMV (controlled mechanical ventilation) / double flow with heat exchanger / night-time over-ventilation, allowing natural cooling of at least part of the spaces in the structure (sensitive to temperature increases)
Space cooling system
- Primary space cooling system
- Chilled water production group/fan coil/VAV system
Space heating system
- Primary Space heating system
- Coal boiler
- Description
- Fuel boiler room / Fan coil / VAV system (variable air volume system)
Water heater system
- Description
- Fuel boiler room / other domestic hot water system
Lighting system
- Primary lighting system
- LED (Light emitting diode lamps)
- Efficiency
- 100
- Description
- Compliance with normative values of illumination according to the types of space while using equipment more efficient than ASHRAE standards
- Secondary lighting system
- Access to daylight for all hospital rooms
- Description
- Access to daylight for all hospital rooms. A natural lighting study was planned in the 1-bed and 2-bed hospital rooms ensuring the level of Daylight Factor (DF).
Shading devices
- Type of shading system installed
- Manual systems (e.g. roller shutters, folding shutters, external blinds)
- Description
- Sun protection that can be operated by users in hospital rooms and more particularly in rooms subject to the risk of excessive solar radiation. Movable, adjustable exterior sun screens in hospital rooms.
Final Energy Demand
- Total specific final energy demand
- 259,00 kWh/m²a I 21% Energy saved compared to a reference building kWh/(m²*a)
Primary Energy Demand & Emissions
- Primary energy demand
- 665 kWh/(m²*a)
Financial Aspects
- Project construction cost
- 67000000 EUR