Agadir, Morocco
Taghazout surf village
Taghazout surf village was constructed in 2016 by The Development Company and Promotion of Taghazout station (SAPST). The architectural concept of the village is based on the use of ecological materials, in particular wood, spread over 5 hectares, the village is made up of a surf academy, a restaurant, two dormitories, and 75 accommodations set back towards the inside the grounds, a surf shop, two relaxation areas and technical rooms and rooms dedicated to staff. The site is located in a fairly mountainous area (Western High Atlas) in its entire extent, but with relatively flat plateaus along the coast.
Project info
- Construction phase
- New construction
- Building type
- Non-residential building
- Detailed building type
- Net floor area
- 6190 m2
- Stories
- 2 stories
- Construction type
- Wood Frame
- Original construction year of the building
- 2016
- Project contact
- Development Company and Promotion of Taghazout station (SAPST)
- Contact email address
- contact@tadengasurf.com
Project team
- Developer(s)/owner(s)
- Development Company and Promotion of Taghazout station (SAPST)
Building Rating and Certifications systems
- Rating and certifications systems
- Other
- Other certification
- HQE
Building Envelope
External walls
- U-Value
- 0.8 W/(m²*K)
Roof
- U-Value
- 0.4 W/(m²*K)
Openings and windows
- Glazing type
- Double glazed
- U-Value glass
- 2.39 W/(m²*K)
- Overall u-value window
- 3.125 W/(m²*K)
Basement floor
- Description of construction
- N/A
Technical Building Systems
Ventilation system
- Type of ventilation
- Free ventilation (windows)
- Description
- Natural
Space cooling system
- Primary space cooling system
- Mounted single-split or window air conditioner│Usually a visible smaller system mounted outside the wall or above the window just supplying one room
- Efficiency
- 2.8
- Description
- reversible splits/EER=2.8
Space heating system
- Primary Space heating system
- Air-conditioning system (reversible for heating; air-air heat pump)
- Description
- reversible splits/COP=3.2
Water heater system
- Primary water heater system
- Dedicated electric heater (dedicated = just hot water generation)
- Efficiency
- 97
- Secondary water heater system
- Solar Thermal collector on the roof
- Description
- 300L solar water heater
Lighting system
- Primary lighting system
- LED (Light emitting diode lamps)
- Efficiency
- 100
Final Energy Demand
- Total specific final energy demand
- 67 kWh/(m²*a)
Financial Aspects
- Project construction cost
- 9256850 EUR
- Estimated costs of energy efficiency and renewable energy measures
- 43432 EUR
- Certification costs
- 1,237,618 € for studies EUR